datasheetbank_Logo
Integrated circuits, Transistor, Semiconductors Search and Datasheet PDF Download Site

ICE2A0265 View Datasheet(PDF) - Infineon Technologies

Part Name
Description
View to exact match
ICE2A0265 Datasheet PDF : 35 Pages
First Prev 11 12 13 14 15 16 17 18 19 20 Next Last
CoolSET™-F2
6.5V
R FB
Soft-Start Com parator
FB
PW M -Latch
O p to co u p le r
PW M Com parator
0.8V
PWM OP
Isense
x3.65
Im proved
Current Mode
Figure 11 PWM Controlling
3.3
Soft-Start
V SoftS
5.6V
5.3V
T Soft-Start
G ate Driver
t
Functional Description
pull-up resistor RSoft-Start. The Soft-Start-Comparator
compares the voltage at pin SoftS at the negative input
with the ramp signal of the PWM-OP at the positive
input. When Soft-Start voltage VSoftS is less than
Feedback voltage VFB the Soft-Start-Comparator limits
the pulse width by resetting the PWM-Latch (see
Figure 12). In addition to Start-Up, Soft-Start is also
activated at each restart attempt during Auto Restart.
By means of the above mentioned CSoft-Start the Soft-
Start can be defined by the user. The Soft-Start is
finished when VSoftS exceeds 5.3V. At that time the
Protection Unit is activated by Comparator C4 and
senses the FB by Comparator C3 wether the voltage is
below 4.8V which means that the voltage on the
secondary side of the SMPS is settled. The internal
Zener Diode at SoftS has a clamp voltage of 5.6V to
prevent the internal circuit from saturation (see Figure
13).
5.6V
SoftS
6.5V
Power-Up Reset
R Soft-Start
E rro r-L a tc h
RQ
6.5V
C4
5.3V
G2
SQ
4.8V
R FB
FB
RQ
C3
G a te
C lo c k
D river
SQ
PW M -Latch
Figure 13 Activation of Protection Unit
The Start-Up time TStart-Up within the converter output
voltage VOUT is settled must be shorter than the Soft-
Start Phase TSoft-Start (see Figure 14).
CSoft Start = -R---S--o--Tf-t--S---So--tf-at--r-t---S×--t-a--1-r-t--.-6---9-
By means of Soft-Start there is an effective
minimization of current and voltage stresses on the
integrated CoolMOS™, the clamp circuit and the output
overshoot and prevents saturation of the transformer
during Start-Up.
t
Figure 12 Soft-Start Phase
The Soft-Start is realized by the internal pull-up resistor
RSoft-Start and the external Capacitor CSoft-Start (see
Figure 5). The Soft-Start voltage VSoftS is generated by
charging the external capacitor CSoft-Start by the internal
Version 2.0
12
11 Jun 2004

Share Link: 

datasheetbank.com [ Privacy Policy ] [ Request Datasheet ] [ Contact Us ]